Free DIY Backyard Furniture and Project Plans from the California Redwood Association

 

Build your own porch, deck, patio and garden furniture and backyard projects with these free, downloadable plans and building guides.

 

Get do-it-yourself plans for outdoor porch, patio and garden furniture and planters. These free, instant download plans include detailed artwork, materials lists and step-by-step building instructions.

 

Adirondack Chair

Adirondack Swing

Mendocino Garden Bench

Santa Cruz Sandbox

Sonoma Picnic Table

Monterey Potting Center

Petaluma Planters

 


Quality landscape architecture requires building materials that are beautiful and long-lasting. Materials need to withstand environmental elements yet retain their symmetry and aesthetic purpose. Redwood has a well-known reputation for meeting these requirements. Equally important, there are cost-effective redwood grades to specify for every project, whether it is a public plaza or a residential garden.

Performance is more than durability. Redwood has qualities not found in other woods-even woods treated with chemicals. Redwood performance characteristics include resistance to shrinking, warping and checking in addition to durability. This means redwood projects age beautifully. Decks, fences and garden structures made with redwood simply look better ten, fifteen and twenty years after construction.

Visit the California Redwood Association website for more information and free, expert construction and finishing guides.

 
Find More Free Woodwork Plans and Guides

 

Contact Us

Your Privacy

 

 

Sponsors:

 

Free Woodwork Project Plan, Hardware and Supply Catalog  The Rockler Woodworking and Hardware catalog features over 150 pages of great woodworking plans, hard-to-find hardware, products, tools, veneers, supplies, how-to videos and guide books. Order your free copy today.

Do It Yourself Country Furniture  Find plans, supplies, hardware and how-to advice. Build any of hundreds of attractive and sturdy do-it-yourself furniture projects with easy-to-use project plans, complete material cut lists and step-by-step instructions. Create beautiful heirloom pieces in Country, Mission, Craftsman and Shaker styles. Find the tools, hardware and supplies that you'll need.